Farhenheit construction walk-thru 3-12
Hershey Park was nice enough to invite Coasterdom to go on a walk-tour counstruction tour of the new coaster. The tour was to be topped off by the top of the lift/drop being placed. Saddly becasue of the wind that was not possible.

Some of the hardhats for Fahrenheit.

The station as of now. This will be the exit side, with the on-ride photo booth.

This is to the right of the station and where the line/enterance will go. The entire line will be between the brake run and the station. Those wood pieces are for the station’s roof.

A lot happening in a tight space

That plug is where they insert sand to make the coaster quieter.

The top piece waiting to go in.

Howler is pretty much done, the lights are even working.
I’m not on a great computer doing this update, and this is about as much as I can do until Sunday. I will continue with the update there and let you in on some awesome things I learned. You can see the all of the photos here. EDIT: Part two has been posted and you can view it here.

