Voodoo moving along

I was checking out the Voodoo webcam today and saw that a lot had been done since I last looked. The station (building and track) is going up very quickly. It was only two weeks ago that they started vertical construction. The thing that I find most interesting is that Fahrenheit started vertical construction right around time and it is obviously a much bigger coaster. It looks like the ride will really be going vertical soon.

Two new Intiman’s for PA and I’m about 40 minutes from both (sorry couldn’t hold the excitement in)!

Leave a Reply